Requirements and Planning (RAP)
Requirements and planning (RAP)
Responsible for the collection, standardization, configuration management, and
assessment of all NOAA observation requirements. Develops and implements the
processes to (1) trace NOAA observation requirements up to Performance Measures
and down to current, planned, and potential observing capabilities, and (2) verify
and validate requirements. Works with the Observation System Architecture (OSA)
component to assess observation requirements and identify gaps in capabilities.
Facilitates documentation of GEO, USGEO and CRSSP observation needs to determine
common requirements and the comprehensive set of observing capabilities needed to
address multi-agency missions.
More information can be found on the following websites:
NPOESS: Integrated Operational Requirement Document (IORD) II:
- NPOESS - Technical Requirements Document (pdf)
- http://www.ipo.noaa.gov/Library/techreq_NDX.html
- NPOESS - Integrated Operational Requirements
Document II (pdf)
GOES-R:
Product Requirement Document(GPRDv1):
ftp://ftp.osd.noaa.gov/Goes-R/GOES-R_Requirements/GPRD%20I%20Master/
GOES Mission Requirement Document (MRD):
- ABI: Performance and Operational
ABI Requirements Document (PORD),
Baseline Version 2.0, dated May 3, 2004:
http://goespoes.gsfc.nasa.gov/goesr_industry.htm
- HES: Performance and operational HES Requirements Document (PORD), Baseline Version 2.0, dated May 3, 2004:
http://goespoes.gsfc.nasa.gov/HEShome.htm
http://www.nosa.noaa.gov/requirements_FY07.html
NOAA'S Observational Requirement Collection Process (pdf)
Contact:
Pam Taylor, NOAA Observational Requirements Lead
E-mail: Pamela.Taylor@noaa.gov
or
Or John Pereira, Group Supervisor
Email: John.Pereira@noaa.gov
|
|
|
|